Telepon: +0086-17802529388 Surélék: tzxinyue@gmail.com

Meunang Quote a

Warta pausahaanWarta

Installation of the mini excavator powder coating line is in progress

The installation of the mini excavator garis palapis bubuk needs to take into account adaptability and efficiency, and it mainly follows the three principles of precise positioning, standardized assembly, and strict debugging.

Installation of the mini excavator powder coating line is in progress
Powder coating line installation in progress

First, determine the installation coordinates of the conveying track, stan bubuk coating, and curing oven based on the site dimensions to ensure compatibility with the excavator body size; then complete the assembly of the powder spraying gun, recovery system, and temperature control equipment to guarantee a powder circulation utilization rate exceeding 98.9%.

Powder coating line installation in progress

After installation, perform no-load and load tests to calibrate the uniformity of powder coating thickness (50 – 80μm) and curing temperature curve (180 – 200, 15 – 20min). The entire process is suitable for the multi-component spraying requirements of mini excavators, helping to achieve production goals of wear-resistant and corrosion-resistant coatings and efficient delivery.

saméméhna:

Teras:

Kantunkeun pesen